
There is an underground shopping mall under the 10-lane road.
There is subway line 3 under the underground shopping mall.
Line 9 must be drilled at 15cm intervals right below subway line 3, but it must not affect the superstructure.

There is an underground shopping mall under the 10-lane road.
There is subway line 3 under the underground shopping mall.
Line 9 must be drilled at 15cm intervals right below subway line 3, but it must not affect the superstructure.