Filter by Category




Ulleungdo update

0
(0)

image text translation

ugh tbccokrlnewslview:
2
According to Ulryung County, it belongs to Seaspoville, which operates between Gangtong and Ulryung.
Passenger ships are unable to use Gangreum Passenger Terminal and regular inspection and maintenance rates are limited.
We will be completely closed at the end of the month.
The Mukho and Ulryung routes will also be closed until March of next year after completing operations on the 9th of next month.
Ports are scheduled for:
The Pohang-Ulleung route, which is the most frequently used route by Ulryung Island residents, is excellent.
The speedboat El Dorado Express was out of operation after an engine failure last April.
Rental of the ‘Sunrise’, which was temporarily deployed on this route, even though it is in an impossible condition.
The period is scheduled to end on the 9th of next month:
Uldeung Sunflow Cruise, launched on the Hupo-Uldeung route, suffered losses last September
Flights have already been suspended due to accumulation.
Here, the last remaining ‘Ulryung Cruise’ will be held in Boreum-dong from December 8th.
Since it is scheduled to be included in the regular inspection schedule, Ulleung Island and the mainland will be inspected in mid-December.
The thought-provoking situation in which all passenger ships are stopped can become a reality.
The excitement is rising:
If it goes around like this, not only will tourists stop coming, but Ulryung Island residents will also stop visiting.
There is bound to be a serious disruption in the supply of daily necessities.
Especially when an emergency patient is on foot, they have no choice but to wait for the helicopter.
If the weather is bad, even the skyway will be cut off, increasing anxiety among residents.
It is
An Ulryung-gun official said, “We plan to adjust the sailing schedule with each shipping company and introduce alternative ships.”
“We are continuously considering this,” he said. “In the worst case scenario, the government and marine fisheries
“We are considering requesting emergency assistance from the Ministry,” it said:

source:

https://www.tbc.co.kr/news/view

It is highly likely that all passenger ships connecting the mainland will stop for 15 days from December 8th.

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Leave a Comment