Filter by Category




A rebuttal to the article, “Which road in Magog has changed dynamically?”

0
(0)

image text translation

This is an aerial view from 2011.

Construction is still underway before the road is built.

image text translation

{5(goth

This is an aerial view from 2013.

At this time too, there is no way yet.

What is unusual is that due to the construction of the Magok district, the airport road was partially curved and a new road was created.

(The red circle on the right is Balsan Station)

image text translation

Cr

This is an aerial view from 2014.

At this time, foundation work for that road (yellow line) is being done.

image text translation

For reference, the distance of that yellow road is about 250 meters.

image text translation

Majeuk Station
Engineering College
II
105
Junmart
Star Bus
00
Yumatawi
total distance
2412r
D06 Bobsturge
241.27
Paris Baguette
Dobu
3 minutes
bicycle
In magic, quickly
Yes Bae
‘g moon lace
Io 12 Complex Apartment
clear
DoI
Mega MGC Kida
SC Jeil LAN
Pizzaspal
mageuk
W Tawi
After the entrance exam
GS The I Slow City

When carrying out an urban development project,

You can think of it as simply wiping out the neighborhood and redrawing new roads and lots.

That neighborhood was originally a collection of numerous irregularly shaped lots, but it was newly created like a checkerboard.

As in the original article, it makes no sense for the road that existed in 2009 and 2014 to remain the same in 2024 and for the surroundings to change.

The road view was probably taken in 2009 or 2014.

As mentioned in the first photo of this article, it is a road that branches off from Gonghang-ro and goes straight from the northeast to the southwest.

It will be a farm road around the yellow line.

It’s okay to be sarcastic in the comments, but

It is a bad habit to insist that something that is not true is true.

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Leave a Comment