Composition of steel bridge

image text translation
RPF
Beamn
MSP Girder
RPF Snake Gaek Mieumumpic; 2,10Dkgtlcm?
FFville
Gangeo fishery sound pick
2,520xglicm?
@Bun]_oWater Ea”Rom
For tension (
Orgilcm?
Gunyeon Bobsaeng Eokda
[J B/enemy
Minimize maintenance costs
PF vs. Gangjibab
beforehand
Prekist concrete with rolling force introduced
PF Beamn’s lower part is okay.
Appropriate amount for good concrete
In punishment
(I’m going to go crazy
Synthetic sican weeks over time
according to
Unbonded PS gift
Placed by adhesive flange
Long-term loss product that acts as a concrete example
induce
two days
Overview of construction method
Freeflex wire with axial strength on muscle concrete
Doe Priest
Sufficient compensation will not be overturned, but the tension will increase gradually.
In less
by
Introduce it and get it right away
By far
The usability and performance of PSC BEAM using the method introduced in the East Sea
Do not allow tensile force to occur.
common ratio
PFEFLEX EEAM Rain’s Girder Pus
Yoo Ji-hwan
The leaves are persimmon
Chemical fiber PSC method
Step 1: Production of |-side girder
(Galyeon Line
Birch residence reforestation)
Step 2
Free Flex
Step 3
Pouring and curing of habuppultteunji zonecrete
Step 4
Release
Step 1: |-Pyeong girder production
Step 2
Habu Pleotji Gamcrete Guantel production
Step 3
1st In-cup (outside)
Step 4: |-side girder elastic installation
Step 5
Gamyeonseon Minjang divination
Step 5
Non-export concrete poured mesh snake
Step 6: 1st tension, wire reduction, additional tension
Step 7
2nd Injam Purification
Step 6
Gunlunger’s best floor tube
construction
Step 8
Girder mounting and slabo construction
[Span length and suspension height
soy sauce
Side high
soy sauce
Also includes slabs
1.55
1.65
1.85
2.15
Slab included
12
1.3
15
1.9