Jamboree Campground Construction

0
(0)

image text translation

(1)Subscribing to V
(2)It is difficult to avoid criticism that he failed to stop it
(3)When did Jamboree start major construction and services
(4)Selected as the venue for Saemangeum in Jeonbuk on August 17, 2017
(5)Problems Revealing the Content of Bid Closing Date Service
(6)Infrastructure installation construction in 2021
(7)Lack of campsite drainage
(8)7 billion won on Nov. 25
(9)Controversy over shower areas visible from outside shower areas and water supply stations in 2023
(10)Installation construction of 1.8 billion won (43 to 67) is installed compared to the plan on March 14
(11)campsite control
(12)Exposed to mosquitoes and other pests on March 24th
(13)350 million won
(14)Establishment and operation of the performance stage
(15)June 13th: Lack of environmental arrangement such as weeds near the stage
(16)460 million won
(17)Construction Waste Disposal
(18)It opens on July 27 with waste piled up all over the venue
(19)70 million won
(20)Jamboree Opening Ceremony on August 1st
(21)The essential facilities for participants to use were also found to be insufficient than originally planned According to the initial plan announced by the Saemangeum Development Administration in 2016, 278 water supply stands in 417 shower areas were planned to be built in the estate The actual shower area at the campsite is 281 dong 67

httpsnnewsnavercomarticlenewspaper0200003513881date=20230809

It looks like we need a thorough investigation

I knew it

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Leave a Comment