image text translation
(1)Breaking news: A15 rebar 154 all negative A2 123 missing 101
(2)Input 20230731 PM 422 Revised 20230731 PM 442 Article text
(3)Reporter Park Kyung-hoon
(4)According to the Ministry of Land, Infrastructure and Transport’s announcement on the 31st, the A15 district in Hoecheon, Yangju, currently under construction, has lost 154 of the 154 reinforcing bars that will fit the entire pillar due to structural calculation
(5)The design of the complex is pan-city U&P, and the construction of Hanshin Gongju is Dain Group and SI
(6)Eumseong Geumseok A2, which has already been moved in, omitted 101 out of 123 rebars due to the placement of the other floor plan The A25 in Namyangju Byeolnae, which also finished moving in, also missed 126 out of 302 rebars due to the placement of another floor plan Osan Segyo 2 A6, which is scheduled to move in, omitted 75 out of 90 due to the omission of the details of the construction book
(7)Yangju Hoecheon A-15BL Apartment Construction Unit 6 Safety Prayer System
(8)Hanshin Engineering & Construction Co., Ltd. 2022127
(9)The method of reinforcing the completion of moving in and the cost of the shading table is KRW 1 million
(10)Missing target
(11)Missing structural calculation
(12)Paju Unjeong A34
(13)Missing representation of calculation missing drawing in plan change section
(14)Relocation of Chungnam Provincial Government
(15)731 Completed
(16)Missing in New Town RH11 Shear Reinforcement Detail
(17)Missing drawing
(18)627 Completed
(19)Missing in shear reinforcement details
(20)The pilot, Dr. Slavebo
(1)Yangju Hoecheon A-15BL Apartment Construction Unit 6 Safety Prayer Systemimage text translation
(2)Hanshin Construction Co., Ltd. Dowon E&C 18 Durbon General Construction Co., Ltd
(3)Shading table completed moving in
(4)Method of reinforcement to be omitted and
(5)Cost 1 million won Slab Complement 52
(6)Missing structural calculation
(7)Paju Unjeong A34 Chungnam Provincial Government Transfer New Town RH11
(8)Missing representation of calculation missing drawing in plan change section
(9)731 Completed
(10)Missing drawing representation missing from shear reinforcement detail missing structural calculation missing from shear reinforcement detail missing calculation of plan change section
(11)Suseo Station Area A3 residential area 5345 slab supplementation 627 completed 42
(12)9 after completion
(13)Suwon Dangsu A3 residential area 9325531 completed
(14)Missing details of the construction book 9 Osan Segyo 26
(15)In another floor plan, A25 by Baegeun Namyangju
(16)Completed 101123 completed investigation 346 Eumseong Geumseok A2 Princess Wolsong A4 Asan Tangjeong 2-A14
(17)Investigating completion 362
(18)Yangju Hoecheon A15 Slab Supplementation
(19)Missing shear calculation for all sections
(20)Structural calculation error
(21)Gwangju Sunwoon 2 A2
(22)Calculation formula error
(23)Reinforced concrete
(24)Gongyang Sansa Song Company A2
(25)Structural calculation error
(26)6 Yangsan Sasong AB
(27)Reinforcement root application interval error
(28)Paju Unjeong 3 A23 to be sold 6304
(29)Missing calculation of plan change interval
(30)Incheon Family 2 A1
(31)Insufficient amount of shear reinforcement reinforcement
(32)Number of missing bars Total number of columns on the volume plate
(33)The construction period can be changed in consultation with the residents
!
AI IMAGE