[wd_asp elements='search' id=11]

Current Status of Ulleungdo Airport Under Construction

()

Process rate 2718 as of the end of February

Current Status of Ulleungdo Airport Under Construction
image text translation

Current Status of Ulleungdo Airport Under Construction

image text translation

Current Status of Ulleungdo Airport Under Construction

image text translation

Current Status of Ulleungdo Airport Under Construction

image text translation

(1)Sadong Port Stage 2
(2)Sadong Port Stage 1
(3)Sadong Port South Breakwater
(4)Sadong Port East Breakwater t=640m
(5)a passenger terminal
(6)a four-stone sloping system
(7)a four-stone sloping system

How useful was this post?

Click on a star to rate it!

Average rating / 5. Vote count:

No votes so far! Be the first to rate this post.

Leave a Comment