[wd_asp elements='search' id=11]

Airplane to ride when Ulleungdo Airport is completed.jpg

()

Airplane to ride when Ulleungdo Airport is completed.jpg


Ulleungdo Airport, which began construction with the goal of opening in 2025
Airplane to ride when Ulleungdo Airport is completed.jpg
Considering the natural environment of Ulleungdo Island, a 1200m runway and passenger terminal will be built
The aircraft that can be operated is a commercial model with a size of less than 50 seats
Designed a runway with specific aircraft in mind in the first place
Airplane to ride when Ulleungdo Airport is completed.jpg
The main character is ATR 4272 series of ATR, a joint venture between Airbus of France and Leonardo of Italy
Airplane to ride when Ulleungdo Airport is completed.jpg
Airplane to ride when Ulleungdo Airport is completed.jpg
The ATR 4272 models, which can take off and land on very short runways around 1000 meters, are eco-friendly aircraft
High economic efficiency with fuel consumption 30 or more lower than comparable size gas with jet engines
Airplane to ride when Ulleungdo Airport is completed.jpg
Airplane to ride when Ulleungdo Airport is completed.jpg
High Air’s ATR 72-500 passenger plane, the only Korean private airline to introduce the ATR 72 model, has a length of 272 meters and a wingspan of 271 meters, with 50 passengers on board
Airplane to ride when Ulleungdo Airport is completed.jpg

How useful was this post?

Click on a star to rate it!

Average rating / 5. Vote count:

No votes so far! Be the first to rate this post.

Leave a Comment