Rebar missing construction contractor vs re-construction request implementer

0
(0)

image text translation

(1)Missing some column band bars
(2)Half of the band bars are missing at 7 locations
(3)0706 Sturham defeated Wolverhampton 03 West Ham Football Jeju Havertz Goal Arsenal Brigh Cheonan
(4)In addition, large construction companies’ reinforcing bar missing VDDN reinforcing bar detection GPR equipment screen body temperature –25
(5)a sign of having a band reinforcing bar
(6)Soccer Hwang Hee-chan was completely defeated by Wolverhampton West Ham without a goal in full time… Wolverhampton 0 700th place
(7)Poor construction even after cold wave warning Gangwon Taebaek government’s countermeasures
(8)15 cm apart
(9)30cm apart
(10)Apartment in Bulgwang-dong, Seoul
(11)B1F, Ju Gi-dong
(12)the condition of being reinforced with a band
(13)15 cm apart 15 cm apart
(14)12 bars, 6 bars, 6 bars
(15)0706 Joining Francisco Lee Jung-hoo returned home this afternoon with KIA Socrates and a total of $1.2 million Yeosu
(16)a representative of the executive branch of the government
(17)We can’t acknowledge the safety
(18)So we asked for a complete reconstruction
(19)10701 Disaster Breaking News Please pay special attention to traffic safety and pedestrian safety, such as not walking with your hands in my pocket ○ That’s it
(20)Some pillar bandage missing muscle THAIMIDYTN cold wave warning
(21)Huh Hyun, head of the public relations team at Daewoo Engineering & Construction Co., Ltd
(22)I’m asking them to take over at an unreasonable amount
(23)We can’t accept it
(24)0707 There are a number of rapid disaster reports, so the speed of reduction of 20/100 to 50/100 of the maximum speed when driving a vehicle is reduced
(25)We’ve done a bad job, so build it again
(26)It’s too much to ask. I can’t

!