Filter by Category




Acquired a design plan for a separate GS underground parking lot, “Reinforcing bars fall out of column 70”

0
(0)

image text translation

(1)9 From the sole design, reinforcing bars fall into column 70

image text translation

(1)Let’s start with 70 off the design
(2)777 Design Systems

image text translation

(1)Let’s start with 70 off the design
(2)Ahn Tae-sang, Architectural Structural Engineer
(3)There should be similar rebar numbering under similar conditions Plate-free structural height
(4)Because of similar control area and similar load, the shear reinforcement reinforcement reinforcement
(5)I think it’s weird for the general public to think that I’m out of it’

image text translation

(1)Let’s start with 70 off the design
(2)Reinforcement of underground parking lot
(3)an entire column
(4)284 missing design’
(5)Q. KBS report

image text translation

(1)Let’s start with 70 off the design
(2)CGS Construction Co., Ltd
(3)Voice modulation of GS E&C officials
(4)We’re going to go over the design changes, but we’re not going to go over the parts that we’re going to do with the design document, the blank version, and I mean, we’re not going to go over the blank version I don’t have any doubts

An analysis obtained alone showed that 70 percent of the reinforcement was missing

The design office of LH, the ordering company, and GS Engineering & Construction, the contractor, changed the design after consultation

GS E&C explained that the contractor only reviews the changes in the design, but it is the responsibility of the design office to determine the appropriateness of the structural design

However, the design office and LH, the ordering company, claimed that GS Engineering & Construction was actively involved in the design, such as directly giving work instructions on more than 100 items

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Leave a Comment