image text translation
(1)24-1 Hyoje-dong, Jongno-gu, Seoul Decommissioning Project
(2)Three-lane road control due to a slope of the bowel screen. All lanes are closed after 1230 Please pay attention to vehicle operation and pedestrian safety
(3)Guide to V road control time
(4)From 12:30 p.m. to 18:00 p.m., the start time of work, #Four lanes of all lanes are scheduled to be controlled
(5)Three lanes closed until 12:30
(6)I hope you finish the work safely without any casualties
Is that right
It reminds me of an accident a while ago