Current Status of Ulleungdo Airport Under Construction

()

Process rate 2718 as of the end of February

image text translation

image text translation

image text translation

image text translation

(1)Sadong Port Stage 2
(2)Sadong Port Stage 1
(3)Sadong Port South Breakwater
(4)Sadong Port East Breakwater t=640m
(5)a passenger terminal
(6)a four-stone sloping system
(7)a four-stone sloping system